Valeo Lighting Systems has a global network of 60 factories that produce lamps for the automotive industry.  The international business is covered by a universal insurance policy.  This meant that when the business in Belgium required a temporary warehouse the demands that would be put upon the supplier to comply with universal standards was huge.

Neptunus were able to match the brief using an Evolution structure; insulated as standard, the temporary building also required fire resistant cladding to the roof and walls.  The roof construction was strong enough to support a sprinkler system and accommodate the increased wind and snow loads required.  Dock levellers and large vehicle doors were installed to complete the construction.