Back in operation quickly with a temporary storage facility
Following a fire, replacement storage space was urgently required at very short notice. To resume operations as quickly as possible, a solution was needed that could be delivered rapidly while meeting all the requirements of a fully functional storage facility.
Thanks to its available capacity, extensive stock and many years of experience in modular building solutions, Neptunus was able to respond immediately. Using the Evolution building system, the required temporary space was delivered within a short timeframe.
The solution
Neptunus delivered a temporary business facility using the Evolution building system. This demountable structure combines the speed of temporary construction with the quality and functionality of a permanent building. As a result, the required business space could be realised within a short timeframe.
The Evolution system can be erected quickly thanks to its hydraulic construction method. The aluminium spaceframe roof structure is first assembled at ground level and then hydraulically lifted into position. The roof and insulated wall panels are subsequently installed, creating a fully functional business facility that can be put into operation in a short period of time.
The challenge
Speed was a critical factor in this project. Following the fire, there was an immediate and unexpected need for replacement space. Every day that the required business facility was unavailable had an impact on business continuity.
Neptunus was able to respond quickly to this urgent space requirement. Thanks to the combination of extensive stock availability, available construction capacity, experienced installation teams and specialist expertise, the project could be prepared and delivered within a very short timeframe.
However, speed was not the only priority. Quality and functionality were equally important, ensuring that the temporary building was fully suited to daily operations from day one.
- video
The Evolution: a rapid temporary solution to minimise downtime after a fire.
Minimising downtime after a fire with a fast and flexible temporary solution
This video shows how Neptunus rapidly delivered a temporary business facility using the Evolution building system. Thanks to available stock, construction capacity and extensive experience in demountable building solutions, the project could be completed within a short timeframe, providing a fully functional facility that was ready for immediate use.
The result
The temporary structure ensured that storage space was available again within a short timeframe, allowing the organisation to quickly address the space requirements that arose following the fire.
The Evolution building system is fully demountable and consists of reusable components. Once the temporary facility is no longer required, the structure can be dismantled and redeployed at another location. This makes the Evolution a fast and flexible solution when additional space is needed at short notice.