VION
VION, the specialists in processing fresh, top quality meat, were urgently looking for temporary space. This temporary production hall had to comply with the applicable building regulations and naturally fire safety and insulation demands. An extra aspect to be considered was the stringent hygiene requirements placed on the materials used in the building. Tight constraints also applied to the delivery time, as no valuable production time could be lost.The local authorities withheld permission to put up a tent on the industrial estate. Neptunus came up with the answer by supplying an Evolution, which has the appearance of a permanent building and also boasts an insulated roof and walls.