Holland Casino

Holland Casino in Zandvoort had a request: an aluminium hall that could act as a temporary replacement for the existing casino. And Neptunus came up with an answer:

The semi-permanent Evolution with thermal and acoustic insulation to protect the building from the often harsh coastal climate. In addition - and not unimportant considering the project was a casino -  the Evolution could be secured against breaking and entering. A solid floor guaranteed a vibration free surface for the gaming tables. The eye catching and stylish interior and exterior of the Evolution suited it perfectly for a glamorous location like a casino. The sloping surface the Evolution was built on was evened using a concrete column system that supports and anchors the main building. For access to the various existing (offices and toilets) facilities, Neptunus designed and constructed a linkway with the mother building. The Evolution was supplied complete with carpeting, climate control, lighting and all the cabling for the alarm system and CCTV circuit.

Direct contact »


Notice: Undefined index: nieuwsbrief in /var/data/httpd/www.neptunus.eu/htdocs/private/views/view.reference.php on line 133

* Obligatory Field

Evolution References